TELUS requires a number of documents to begin a project.
TELUS requires a number of documents to begin a project. The requirements vary by project. The more information you provide at the beginning of your project to provide clarity for the TELUS Build team during project assessment.
|
Document Type |
|
Description / Additional Detail |
|
Format |
|
Proposed Civil Site Plan |
|
Site location, proposed route |
|
|
|
Civil site (DWG) |
|
AutoCAD format of the site plan |
|
AutoCad |
|
Electrical Drawings - Fortis or Hydro |
|
Required for shared trench and pole relocations |
|
|
|
BC Hydro New Civil Drawings for review by TELUS |
|
Proactive Intake (NPI) and conversion of BC Hydro Data (development Applications) |
|
|
|
BC Hydro Relocation Pole Plan Drawings for review by TELUS |
|
Gets sent to the DRM Prime for further processing |
|
|
|
BC Hydro "NOTICE OF WORK" with Civil drawings for review by TELUS |
|
Gets added to the Old Intakes (NPI) or NGMR/NGMC if its converted |
|
|
|
Clearance Letter |
|
Provided to developer by designer based on developer's offshoring drawings |
|
|
|
Acceptance Letter |
|
|||
|
Civic Addressing |
|
Civic Addressing Document received from the developer or City office and City GIS map snippets upload in NGM/NGMR/NGMC for pending civic addressing details. |
|
PDF/PNG |
|
Electrical site plans |
|
|
PDF/ DWG |
|
|
Riser plans/ drawings |
|
|
|
|
|
Site Plans |
|
|
PDF/ DWG |
|
|
Floor plans |
|
|
|